McGill University has mandated Couvertures St-Léonard to carry out the following project: University Centre / 18-045 - roof replacement

The project consists in the replacement of the roof, skylights and storm drains.

Project managers: Eric Boutet, CIMA+ - eric.boutet [at] cima.ca

Assistant project manager: Aldo Aranza Mendoza, CIMA+ - aldo.aranzamendoza [at] cima.ca

Construction start date: May 2023

Classified as: University Centre
Published on: 25 Apr 2023

McGill University has mandated Atwill-Morin to carry out the following project: Strathcona Music Building/ 16-135 - Envelope Renovation.

Classified as: Strathcona Music Building
Published on: 31 Mar 2023

McGill University has mandated Construction Sélection SRJ Inc to carry out the following project: Technical Services Building, Macdonald Campus / 17-124 - Deferred Maintenance.

The project consist of upgrading the Welding Lab exhaust system and new teaching laboratory, as well as deferred maintenance repairs, including fire protection compliance, code compliance, mezzanine work, repairs to the envelope, installing a new ventilation unit, electrical work and civil work.

Project managers: Anne-Catherine Parent and Francois Brassard

Classified as: Technical Services Building, Macdonald Campus
Published on: 13 Jan 2023

McGill University has mandated Corenov Constructeurs to carry out the following project: Bronfman Building / 18-094 - Computer lab 045 -046.

The project consists of transforming existing classrooms into two computer teaching labs with new audiovisual equipment and a reconfiguration. The scope includes the demolition of the back walls to include storage areas as part of the new teaching labs.

Project manager: Joé Normandeau (GPH Inc.) - joe.normandeau [at] gph-inc.com

Classified as: Bronfman Building
Published on: 14 Dec 2022

McGill University has mandated Les Entreprises N.R. Brosseau Inc. to carry out the following project: Frank Dawson Adams / 21-036 - Redesigns on floors 1 & 2 to welcome librarians’ offices

Classified as: Frank Dawson Adams Building, FDA, Adams Building
Published on: 12 Dec 2022

McGill University has mandated Construction PCL Inc. to carry out the following project: Pine Avenue #527, 523, 517, 515 and 509 / 19-172 – Sylvan Adams Sports Sciences Institute

The project consists of redeveloping four row houses McGill University owns on Pine Avenue to welcome the newly-created Sylvan Adams Sports Science Institute.

Project manager: Juan Gamarra, WSP 

Assistant project manager: Michaël Srey, WSP

Classified as: Sylvan Adams Sports Science Institute
Published on: 25 Nov 2022

McGill University has mandated Construction SRJ to carry out the following project: Bronfman Building / 18-147 - Dobson Center project.

The renovation of the western end of the ground floor of the Desautels Faculty of Management’s Bronfman Building (1001 Sherbrooke St West) comprises the creation of a new Dobson Centre; the redesign of the Faculty’s mailroom and exam spaces; and the full renovation of the floor’s public washrooms.

Project manager: Isabelle Girard, ing. PMP - Isabelle.girard [at] gph-inc.com

Classified as: Bronfman Building
Published on: 22 Nov 2022

Pages

Back to top